Maintenance

From reactive to planned

Your goal isn't only to repair better. It's to keep the equipment running as long as possible, with as few interventions as possible. With our methodology and AI, we make the real state of your assets visible, space out shutdowns and smooth out scheduling, synced with your CMMS.

The problem

Without reliable data, the calendar is all that's left

Calendar-based maintenance isn't a bad decision, it's often the only one available. Without AI analysis tools and a structured acquisition method, you open up machines that still had more to give, you take production offline and you consume parts as a precaution. And because these assets rarely break, the failure history a predictive model needs doesn't exist.

That's exactly where we come in: building the data that's missing, so the calendar is no longer your only option.

Mechanic, wrench in hand, in front of a mining truck
What we do

From the calendar to real condition

Our case studies related to operations. See our case studies →

01

We cross-check the data against what your technicians know

The measurements already exist, but on their own they say nothing. We set what the variation shows against what your field experts know about their machines, to build a reading that holds up.

02

We model without a failure history

A well-maintained asset doesn't break down, so it teaches a model nothing. Our methodology starts from healthy cycles rather than failures, with your operators in the loop to validate what the data says.

03

We make degradation visible before the stoppage

Mills, compressors, main fans, conveyors. Trends are tracked, deviations surface early and the intervention lands in a window you choose. The interval between maintenance events is set by facts.

04

We get scheduling out of parallel spreadsheets

The planner keeps an Excel file on the side because the system in place isn't enough. We fill that gap and sync with your CMMS, without replacing it and with no double entry.

The impact

What changes

  • Availability gained

    Fewer precautionary teardowns, more production hours on your critical assets.

  • Stoppages avoided

    Degradation is handled in a window you choose rather than endured as an emergency.

  • Zero double entry

    Nothing left to re-key between scheduling and your CMMS.

  • Time to plan

    The planner plans instead of copying.